Iron and Steel CCS Study (Techno-Economics Integrated Steel Mill)
- 1 July 2013
- Capture
- Costs of CCUS
The primary goal of this project is to establish a methodology to evaluate the cost of steel production when deploying CO₂ capture technology in an integrated steel mill. The objectives of this study were: To specify a “REFERENCE” steel mill typical to Western European configuration; and assess the techno-economic performance of the integrated steel mill without and with CO₂ capture. To evaluate the techno-economic performance, the breakdown of the CO₂ emissions; and estimating the CO₂ avoidance cost of the following cases: o Case 1: An integrated steel mill typical to Western Europe as the base case. o Case 2: Post-Combustion CO₂ capture using conventional MEA at two different levels of CO₂ capture rate (End of Pipe Cases or EOP) o Case 3: An Oxygen Blown Blast Furnace (OBF) with top gas recycle and the use of MDEA/Pz as solvent for CO₂ capture